Budget Issue Requests - Tracking Id #1585 City of Rockledge/Cocoa Northeast Retention Area |
|||||||||
|
|
|
|
|
|
|
|
|
|
Requester: |
Don R. Griffin |
Organization: |
City of Rockledge |
||||||
|
|
|
|
|
|
|
|
|
|
Project Title: |
City of Rockledge/Cocoa Northeast Retention Area |
Date Submitted: |
01/27/2000 2:17:55 PM |
||||||
|
|
|
|
|
|
|
|
|
|
District Member: |
Bill Posey |
Service Area: |
City/Town |
||||||
|
|
|
|
|
|
|
|
|
|
Counties Affected: |
Brevard |
||||||||
|
|
|
|
|
|
|
|
|
|
Recipient: |
Cities of Rockledge & Cocoa |
Contact: |
Don R. Griffin |
||||||
|
1600 Huntington Lane |
Contact Phone: |
(321) 690-3978 |
||||||
|
|
Rockledge 32956-0488 |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Project Description: |
|
|
|
|
|
|
|
||
The project involves the purchase and retrofit of 2.2. acres of property, in a 60-acre basin, which will receive storm water runoff from the Cities of Cocoa and Rockledge. The property will be converted into a dry retention system, with the installation of catch basins in the surrounding area and the installation of a weir to a discharge pipe which currently empties into the Indian River Lagoon. They also anticipate placing a CDS unit in the pipeline along Sweet Street at Rockledge Drive, before any waters discharge into the Lagoon. The property is located on the old coastal dune system, which enhances infiltration and is highly permeable. Because of the soils in the area, the system will be a dry retention system. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Services Provided/Benefit to State: |
|
|
|
|
|
||||
A primary purpose of the project is surface water restoration. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Measurable Outcome Anticipated: |
|
|
|
|
|
||||
It has been determined that the proposed on-site detertion systems will reduce phosphorous rates by 20-30%, however, that figure may be as high as 40%, based on soil conditions in the area. Nitrogen rates will reduce by 20-30%,however that figure may be as high as 40%, based on soil conditions in the area. Total suspended solids will be reduced by 80-90%; lead by 70-80%; zinc by 40-50%; BOD and COD by 20-40%. The current drainage pipe will be fitted with a CDS bafflebox unit. to reduce pollutants. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Amount requested from the State for this project this year: |
$100,000 |
||||||||
|
|
|
|
|
|
|
|
|
|
Total cost of the project: |
$350,000 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Request has been made to fund: |
Construction |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Is there Local Government or Private match for this request? |
|
Yes |
|
||||||
|
Cash Amount: |
$180,000 |
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Was this project previously funded by the State? |
|
No |
|
||||||
|
|
|
|
|
|
|
|
|
|
Is future-year funding likely to be requested? |
|
Yes |
|
||||||
|
Amount: |
$55,000 |
|
|
|
|
|
||
|
Purpose for future year funding: |
|
YesNon-recurring Construction |
|
|||||
|
Will this be an annual request? |
|
|
No |
|
|
|||
|
|
|
|
|
|
|
|
|
|
Was this project included in an Agency's Budget Request? |
|
Unknown |
|
||||||
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Is there a documented need for this project? |
|
Yes |
|
||||||
|
Documentation: |
DEP Water Advisory Panel |
|||||||
|
|
|
|
|
|
|
|
|
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
Yes |
|
|||||||
|
Hearing Body: |
Brevard County Legislative Delegation |
|||||||
|
Meeting Date: |
12/16/1999 |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|