House Community
Budget Issue Requests - Tracking Id #1982 Grant Hunter Pond Flood Attenuation and Water Quality Pond |
|||||||||
|
|
|
|
|
|
|
|
|
|
Requester: |
Katherine Burke |
Organization: |
City of Plant City |
||||||
|
|
|
|
|
|
|
|
|
|
Project Title: |
Grant Hunter Pond Flood Attenuation and Water Quality Pond |
Date Submitted: |
01/31/2000 12:01:27 PM |
||||||
|
|
|
|
|
|
|
|
|
|
District Member: |
Johnnie Byrd |
Service Area: |
City/Town |
||||||
|
|
|
|
|
|
|
|
|
|
Counties Affected: |
Hillsborough |
||||||||
|
|
|
|
|
|
|
|
|
|
Recipient: |
City of Plant City |
Contact: |
Katherine Burke |
||||||
|
Post Office Box C |
Contact Phone: |
(813) 757-9283 |
||||||
|
|
Plant City 33564 |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Project Description: |
|
|
|
|
|
|
|
||
The project proposes to divert stormwater from the Westside Canal into a 8.4 acre pond constructed on 11.4 acres of vacant property. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Services Provided/Benefit to State: |
|
|
|
|
|
||||
The pond reduces flood levels of the 100 year 24 hour storm so that a existing low income minority neighborhood in the Empire Bates area will remain accessible. Twenty eight (28) homes will no longer be flooded by up to and including the 100 year storm. These homes sustained recurring flood damages over the years. The area is not in a FEMA flood zone A, but should be until the pond is constructed. Most of the residents do not have flood insurance. By the reduction of flood levels these 28 structure's finished floor will be above the expected flood levels for up to the 100 year event. This will reduce claims through disaster declarations such as the 1997 El Nino SBA declaration. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Measurable Outcome Anticipated: |
|
|
|
|
|
||||
Removal of 28 homes from flooding for up to and including the 100 year event. Reduction of flood levels to allow another 80 homes to be accessible for the same storm event. Provides additional 46 acre feet of flood plain storage. Provides water quality treatment for a 150 acre developed contributing basin. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Amount requested from the State for this project this year: |
$350,000 |
||||||||
|
|
|
|
|
|
|
|
|
|
Total cost of the project: |
$1,200,000 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Request has been made to fund: |
Construction |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Is there Local Government or Private match for this request? |
|
Yes |
|
||||||
|
Cash Amount: |
$850,000 |
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Was this project previously funded by the State? |
|
No |
|
||||||
|
|
|
|
|
|
|
|
|
|
Is future-year funding likely to be requested? |
|
No |
|
||||||
|
|
|
|
|
|
|
|
|
|
Was this project included in an Agency's Budget Request? |
|
No |
|
||||||
Was this project included in the Governor's Recommended Budget? |
No |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Is there a documented need for this project? |
|
Yes |
|
||||||
|
Documentation: |
Westside Canal Master Plan and Flood Reports Damages |
|||||||
|
|
|
|
|
|
|
|
|
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
Yes |
|
|||||||
|
Hearing Body: |
City of Plant City Commission |
|||||||
|
Meeting Date: |
05/12/1997 |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|