Community Budget
Issue Requests - Tracking Id #1936FY0001 Miami-Dade County's Watershed Planning Project: Central Basins Stormwater Planning Component, Phases I and II |
|||||||||
|
|
|
|
|
|
|
|
|
|
Requester: |
Alex Penelas |
Organization: |
Miami-Dade County |
||||||
|
|
|
|
|
|
|
|
|
|
Project Title: |
Miami-Dade County's Watershed Planning Project: Central Basins Stormwater Planning Component, Phases I and II |
Date Submitted: |
2/8/01 5:38:58 PM |
||||||
|
|
|
|
|
|
|
|
|
|
Sponsors: |
Marco Rubio |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Statewide Interest: |
Project will lead to reduction of pollutant loading to Biscayne Bay, a state aquatic reserve. |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Recipient: |
Miami-Dade County |
Contact: |
Diana Ragbeer |
||||||
|
111 NW First Street |
Contact Phone: |
(305) 375-1257 |
||||||
|
|
Miami 33128 |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Counties: |
Dade |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Service Area: |
Government Entity |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
Project Description: |
|
|
|
|
|
|
|
||
A stormwater management plan will be developed for the unincorporated portions of the C-2 and C-100 surface water drainage basins. The stormwater management plan will identify stormwater projects which will improve the quality, timing, and distribution of stormwater discharged to the basin Canals and to Biscayne Bay. Stormwater infrastructure improvements will be indentified for both existing land use conditions and year 2015 land use conditions as identified in the County's Comprehensive Development Master Plan. |
|||||||||
|
|||||||||
|
|
|
|
|
|
|
|
|
|
Measurable Outcome Anticipated: |
|
|
|
|
|
||||
Technical data for the basins will be collected in Phase I including ground surface and ground water elevations, existing stormwater management infrastructure, soil characteristics, water quality data, the ability of canals to convey stormwater and ground water table elevations. This data will be used to develop computer models, in Phase II, which will calculate flows and pollutant loads to the Snapper Creek (C-2) and Cutler Drain (C-100) Canals and to Biscayne Bay. The models will also be used to analyze the timing and distribution of stormwater discharged through the watersheds and to Biscayne Bay. The model output will be used to rank stormwater quality and flooding problem areas in the basins. The Stormwater management plan will then be developed which identifies stormwater improvement projects which will reduce flooding or pollutant loading to downstream water bodies for critical sub-basins within the C-2 and C-100 surface water drainage basins. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Amount requested from the State for this project this year: |
$750,000 |
||||||||
|
|
|
|
|
|
|
|
|
|
Identify item(s) in the Appropriations Bill to be reduced: |
|
|
|
|
|||||
Specific Appropriation #: |
1591 G |
|
|
|
|
||||
Specific Appropriation Title: |
Grants and Aids to Local Government/ Statewide Restoration Project |
|
|
||||||
Amount to be reduced: |
$750,000 |
|
|
|
|
||||
Fund Source: |
Trust Fund |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Total cost of the project: |
$3,707,284 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Request has been made to fund: |
Operations |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Type of funding match: |
Local |
|
|
|
|
|
|||
|
Total Cash Amount: |
$1,000,000 |
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Was this project previously funded by the State? |
|
Yes |
|
||||||
|
Fiscal Year: |
2000-2001 |
Amount: |
$100,000 |
|
||||
|
|
|
|
|
|
|
|
|
|
Is future-year funding likely to be requested? |
|
Yes |
|
||||||
|
Amount: |
$750,000 |
|
|
|
|
|
||
|
Purpose for future year funding: |
|
Recurring Operations |
|
|||||
|
Will this be an annual request? |
|
|
Yes |
|
|
|||
|
|
|
|
|
|
|
|
|
|
Was this project included in an Agency's Budget Request? |
|
No |
|
||||||
Was this project included in the Governor's Recommended Budget? |
No |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Is there a documented need for this project? |
|
Yes |
|
||||||
|
Documentation: |
South Biscayne Bay Watershed Management Plan, Comprehensive Development Master Plan |
|||||||
|
|
|
|
|
|
|
|
|
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
Yes |
|
|||||||
|
Hearing Body: |
Miami-Dade County State Legislative Delegation |
|||||||
|
Meeting Date: |
1/17/01 |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|