Community Budget
Issue Requests - Tracking Id #609FY0001 East Miramar Master Drainage Study |
|||||||||
|
|
|
|
|
|
|
|
|
|
Requester: |
William Estabrook |
Organization: |
City of Miramar |
||||||
|
|
|
|
|
|
|
|
|
|
Project Title: |
East Miramar Master Drainage Study |
Date Submitted: |
02/01/2001 10:20:04 AM |
||||||
|
|
|
|
|
|
|
|
|
|
Sponsors: |
Kenneth Gottlieb |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Statewide Interest: |
To protect the property and quality-of-life of residents and taxpayers by reducing flooding |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
Recipient: |
City of Miramar |
Contact: |
Matthew Kane |
||||||
|
6700 Miramar Parkway |
Contact Phone: |
(954) 986-3061 |
||||||
|
|
Miramar 33023 |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Counties: |
Broward |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Service Area: |
Government Entity |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
Project Description: |
|
|
|
|
|
|
|
||
The East Miramar Master Drainage Study, Phase I and II, will be a comprehensive engineering investigation of existing conditions and alternatives for solving drainage and flooding problems within Miramar's eastern neighborhoods. Phase I will study the neighborhoods bounded on the north by Pembroke Road, on the east by State Road 7, on the south by County Line Road, and on the west by Florida's Turnpike. Phase II will study the neighborhoods bounded on the north by Pembroke Road, on the east by Florida's Turnpike, on the south by County Line Road, and on the west by University Drive. These neighborhoods have experienced repeated flooding following heavy rains and hurricanes. |
|||||||||
|
|||||||||
|
|
|
|
|
|
|
|
|
|
Measurable Outcome Anticipated: |
|
|
|
|
|
||||
By upgrading the drainage systems within these neighborhoods, the City will mitigate the destructive impacts of severe flooding. The purpose of the project is to provide the following incremental level of service goals: 1. Maintain a minimum stormwater drainage system to prevent street flooding during the 3 year,24 hour storm event, with a desirable target of protecting against the 5 year, 24 hour storm event. 2. Prevent standing water from exceeding the top of the road (crown) elevation during a 10 year, 24 hour storm event. 3. Prevent flooding of finished floor elevations during the 100 year, 72 hour storm event. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Amount requested from the State for this project this year: |
$300,000 |
||||||||
|
|
|
|
|
|
|
|
|
|
Identify item(s) in the Appropriations Bill to be reduced: |
|
|
|
|
|||||
Specific Appropriation #: |
1393 |
|
|
|
|
||||
Specific Appropriation Title: |
Special Catergories-Grants and Aids-State, Local, and Private Projects |
|
|
||||||
Amount to be reduced: |
$300,000 |
|
|
|
|
||||
Fund Source: |
Trust Fund |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Total cost of the project: |
$950,000 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Request has been made to fund: |
Construction |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Type of funding match: |
Local |
|
|
|
|
|
|||
|
Total Cash Amount: |
$250,000 |
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Was this project previously funded by the State? |
|
No |
|
||||||
|
|
|
|
|
|
|
|
|
|
Is future-year funding likely to be requested? |
|
Yes |
|
||||||
|
Amount: |
$300,000 |
|
|
|
|
|
||
|
Purpose for future year funding: |
|
YesNon-recurring Construction |
|
|||||
|
Will this be an annual request? |
|
|
No |
|
|
|||
|
|
|
|
|
|
|
|
|
|
Was this project included in an Agency's Budget Request? |
|
Unknown |
|
||||||
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Is there a documented need for this project? |
|
Yes |
|
||||||
|
Documentation: |
Miramar Comprehensive Plan/ Broward Cty. Local Mitigation Strategy's priority initiative list |
|||||||
|
|
|
|
|
|
|
|
|
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
Yes |
|
|||||||
|
Hearing Body: |
City of Miramar Commission |
|||||||
|
Meeting Date: |
11/15/2001 |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|