Community Budget
Issue Requests - Tracking Id #634FY0001 Mitigation impacts of increased Lake-Level Fluctuations |
|||||||||
|
|
|
|
|
|
|
|
|
|
Requester: |
Gene Molnar |
Organization: |
Lake County Water Authority |
||||||
|
|
|
|
|
|
|
|
|
|
Project Title: |
Mitigation impacts of increased Lake-Level Fluctuations |
Date Submitted: |
02/07/2001 9:48:38 AM |
||||||
|
|
|
|
|
|
|
|
|
|
Sponsors: |
Randy Johnson |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Statewide Interest: |
Water quality and natural systems improvement to a large, regional chain of Lakes. |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Recipient: |
St. John's River Water Management District |
Contact: |
Carol Senne |
||||||
|
PO Box 1429 |
Contact Phone: |
(904) 329-4447 |
||||||
|
|
Palatka 32178 |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Counties: |
Lake |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Service Area: |
Government Entity |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
Project Description: |
|
|
|
|
|
|
|
||
Forty years of artificially stabilized water levels in the Harris Chain of Lakes has resulteed in poor water quality and the loss of lakeshore habitats for fish and wildlife. We propose to restore more natural water level fluctuations in the lakes to help mitigate this damage. This effort will be accomplished by implementing new schedules for regulating the three water control structures in the chain of lakes. Higher water levels predicted by the porposed schedules would impede operation of some permitted stormwater projects on the Harris Chain of Lakes. Part of the requested funding, $500,000, will be used to redesign and reconstruct projects potentially affected by high water levels. Local match for this effort will be solicited. Public hearing on increasing lake-level fluctuations revealed significant concern about lost boat access from canals to the lake during low-water periods predicted by the porposed schedules. To address this concern for fluctuating water levels, the District and The Lk. County Water Authority have partnered to dredge existing canals on the Harris Chain to improve boat access during droughts. A 1999 legislature funded a feasibility assessment of canal dredging on Lake Griffin, to be completed in the summer of 2001. A 2000 legislative appropriation funded dredging of the top priority canals, to begin in the fall of 2001. Part of the requested funding, $2,400,000, will be dedicated to dredging the remaining canals of Lake Griffin.There have been In-Kind Contributions made but no amount attached to them. So a $5.00 amount has been entered to show that an In-Kind Contribution has been made. |
|||||||||
|
|||||||||
|
|
|
|
|
|
|
|
|
|
Measurable Outcome Anticipated: |
|
|
|
|
|
||||
Water quality improvements(e.g., lower phosphorus levels); acres of restored shoreline habitat; increased number of recreational fishing days |
|||||||||
|
|
|
|
|
|
|
|
|
|
Amount requested from the State for this project this year: |
$2,900,000 |
||||||||
|
|
|
|
|
|
|
|
|
|
Identify item(s) in the Appropriations Bill to be reduced: |
|
|
|
|
|||||
Specific Appropriation #: |
1591G |
|
|
|
|
||||
Specific Appropriation Title: |
Grants and Aids to Local Governments and Nonprofit Organizations - Fixed Capital Outlay: Statewide Restoration Projects |
|
|
||||||
Amount to be reduced: |
$2,900,000 |
|
|
|
|
||||
Fund Source: |
Trust Fund |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Total cost of the project: |
$7,900,000 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Request has been made to fund: |
Operations and Construction |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Type of funding match: |
Local |
|
|
|
|
|
|||
|
|
|
Total In-Kind Amount: |
$5 |
|
||||
|
|
|
|
|
|
|
|
|
|
Was this project previously funded by the State? |
|
Yes |
|
||||||
|
Fiscal Year: |
1999 |
Amount: |
$300,000 |
|
||||
|
|
|
|
|
|
|
|
|
|
Is future-year funding likely to be requested? |
|
Yes |
|
||||||
|
Amount: |
$4,700,000 |
|
|
|
|
|
||
|
Purpose for future year funding: |
|
Recurring Operations |
|
|||||
|
Will this be an annual request? |
|
|
No |
|
|
|||
|
|
|
|
|
|
|
|
|
|
Was this project included in an Agency's Budget Request? |
|
Unknown |
|
||||||
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Is there a documented need for this project? |
|
Yes |
|
||||||
|
Documentation: |
Upper Ocklawaha Basin Surface water Improvement and Management plan |
|||||||
|
|
|
|
|
|
|
|
|
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
Yes |
|
|||||||
|
Hearing Body: |
Lake Griffin Restoration Task Force and the Lake County Water Authority |
|||||||
|
Meeting Date: |
01/17/2001 |
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|