Community Budget Issue Requests - Tracking Id #1843FY0001

Miami-Dade County's Watershed Planning Project

 

 

 

 

 

 

 

 

 

 

Requester:

Miami -Dade County

Organization:

Miami-Dade County

 

 

 

 

 

 

 

 

 

 

Project Title:

Miami-Dade County's Watershed Planning Project

Date Submitted:

2/16/01 11:58:45 AM

 

 

 

 

 

 

 

 

 

 

Sponsors:

Daryl Jones

 

 

 

 

 

 

 

 

 

 

 

 

 

Statewide Interest:

Lead to the reduction of pollutant loading/ dicharge to Biscayne Bay.

 

 

 

 

 

 

 

 

 

 

 

Recipient:

Miami-Dade County

Contact:

Diana Ragbeer

 

111NW 1 Street

Contact Phone:

(305) 375-1257

 

 

Miami 33128

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Counties:

Dade

 

 

 

 

 

 

 

 

 

 

 

 

 

Service Area:

Government Entity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project Description:

 

 

 

 

 

 

 

A stormwater management plan will be developed for the unincorporated portions of the C-2 and C-100 surface water drainage basins. The sotrmwater management plan will identify stormwater projects which will improve the quality, timing, and distribution of stormwater discharged to the basin Canals and to Biscayne Bay. Stormwater infrastructure improvements will be indentified for both existing land use conditions and year 2015 land us condiditions as identified in teh County's comprehensive Development Master Plan.

 

 

 

 

 

 

 

 

 

 

 

Measurable Outcome Anticipated:

 

 

 

 

 

Technical data for the basins will be collected in Phase 1 including ground surface and ground water elevations, existing stormwater management infrastructure, soil characteristics, water quality data, the ability of canals to convey stormwater and ground water table elevations. This data will be used to develop computer models , in phase II, which will calculate flows and pollutant loads to the Snapper Cree (C-2) and Cutler Drain(C-100) Canals and to Biscayne Bay. The modles will also be used to analyze the timing and distribution of stormwater discharged through the watersheds and to Biscayne Bay. The model will be used to rank stormwater quality and flooding problem areas in the basins. A stormwater management plan will then be developed whic identifies stormwater improvement projects which will reduce flooding or pollutant loading to downstream water bodies for critical sub-basins within the C-2 and C-100 surface water drainage.

 

 

 

 

 

 

 

 

 

 

Amount requested from the State for this project this year:

$750,000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total cost of the project:

$3,707,284

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Request has been made to fund:

Operations

 

 

 

 

 

 

 

 

 

 

 

 

 

Type of funding match:

Local

 

 

 

 

 

 

Total Cash Amount:

$1,000,000

 

 

 

 

 

 

 

 

 

 

 

 

 

Was this project previously funded by the State?

 

Yes

 

 

Fiscal Year:

2000-2001

Amount:

$1,000,000

 

 

 

 

 

 

 

 

 

 

 

Is future-year funding likely to be requested?

 

Yes

 

 

Amount:

$750,000

 

 

 

 

 

 

Purpose for future year funding:

 

Recurring Operations

 

 

Will this be an annual request?

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

Was this project included in an Agency's Budget Request?

 

No

 

Was this project included in the Governor's Recommended Budget?

No

 

 

 

 

 

 

 

 

 

 

 

Is there a documented need for this project?

 

Yes

 

 

Documentation:

The south Miami- Dade watershed Plan

 

 

 

 

 

 

 

 

 

 

Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?

Yes

 

 

Hearing Body:

Miami- Dade Sounty State Legislative Delegation

 

Meeting Date:

1/17/01