|
Community Budget Issue Requests - Tracking Id #1378 |
Rebuild Airport Storm Sewer System |
|
Requester: |
Ted Mosteller |
Organization: |
Apalachicola Municipal Airport |
|
Project Title: |
Rebuild Airport Storm Sewer System |
Date Submitted |
1/13/2005 10:58:48 AM |
|
Sponsors: |
Lawson |
|
Statewide Interest: |
Florida Aviation System |
|
Recipient: |
Franklin County Board of County Commissioners |
|
Contact: |
Ted Mosteller |
|
|
33 Market Street |
|
Contact Phone: |
(850) 653-8166 |
|
|
Apalachicola 32320 |
|
Contact email: |
tedmosteller@yahoo.com |
|
Counties: |
Franklin |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Rebuild collapsing storm water piping system |
|
Is this a project related to 2004 hurricane damage? |
No |
|
Measurable Outcome Anticipated: |
Improve Airport safety eliminating existing collapsed pavement, improved storm drainage |
|
Amount requested from the State for this project this year: |
$1,000,000 |
|
Total cost of the project: |
$1,000,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
None |
|
Cash Amount |
$ |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
Yes |
|
Agency |
Transportation, Department Of |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
JACIP & Airport Master Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Franklin County Board of County Commissioners |
|
Hearing Meeting Date: |
01/04/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
No |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Airport Master Plan 2005 Update |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
Northwest FL |
Have you provided at least 50% match? |
No |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Apalachicola Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
The specifics are not available at this time, this subgrade drainaige system is over 50 years old with areas of collapsed pipe. The resulting wash outs cause sedimentation. |
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |