Community Budget Issue Requests - Tracking Id #1277 |
River Oaks/Edgewood Stormwater Management |
|
Requester: |
Gregory Kisela, Asst. City Manager |
Organization: |
City of Fort Lauderdale |
|
Project Title: |
River Oaks/Edgewood Stormwater Management |
Date Submitted |
1/15/2003 11:09:56 AM |
|
Sponsors: |
Mack |
|
Statewide Interest: |
This project meets the objectives of the Florida Water Resources Act by promoting the conservation,development, and proper utilization of surface and ground water, to minimize degradation of water resources caused by the discharge of stormwater and to prevent damage from floods, soil erosion, and excessive drainage. |
|
Recipient: |
City of Fort Lauderdale |
|
Contact: |
Karl V. Shallenberger |
|
|
100 N. Andrews Avenue |
|
Contact Phone: |
(954) 828-7843 |
|
|
Fort Lauderdale, Fl 33301 |
|
Counties: |
Broward |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Construct stormwater infrastructure in thhe River Oaks/Edgewood neighborhoods in the Southwest quadrant of Fort Lauderdale. This will eliminate the malfunction of plumbing in households and the discharge of fecal matter from septic tanks due to drainfields malfunctioning. It will also minimize mosquito breeding grounds caused by areawide flooding, and allow the City to install controls for surface water quality in the New River. The proposed project will include conveyance swales, exfiltration trenches, retention ponds, and the necessary purchase of land to this infrastructure. |
|
Is this a water project as described in Chapter 2002-291, Laws of Florida? |
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP Identfying Number: |
SW20022215 |
|
Measurable Outcome Anticipated: |
The infrastructure will eliminate the malfunction of plumbing in households and the discharge of fecal matter from septic tanks due to drainfields malfunction. It will also minimize mosquito breeding grounds caused by areawide flooding. It will allow the City to direct the stromwater to designed retention areas where best management practices will allow the installation of controls to address surface water quality in the New river. Loadings will be reduced by the control of surface discharge to the waterbodies by controlling sheet flow of retention ponds with overflow discharge only through approved water quality controls. |
|
Amount requested from the State for this project this year: |
$750,000 |
|
Identify item(s) in the FY 2003-04 Appropriations Bill to be reduced: |
|
Specific Appropriation #: |
|
|
Specific Appropriation Title: |
|
|
Amount to be reduced: |
$ |
|
Total cost of the project: |
$5,000,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$160,000 |
|
In-kind Amount |
$1,500,000 |
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
Yes |
|
Amount: |
$1,000,000 |
To Fund: |
Construction, Non-recurring operations |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Professional Engineering Firm study submitted to DEP |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
City of Fort Lauderdale Commission |
|
Hearing Meeting Date: |
05/01/2001 |