Senate Community
Budget Issue Requests - Tracking Id #2326 Lake Okeechobee Restoration |
|||||||||
|
|
|
|
|
|
|
|
|
|
Requester: |
Frank Berardino |
Organization: |
So. Florida Water Management District |
||||||
|
|
|
|
|
|
|
|
|
|
Project Title: |
Lake Okeechobee Restoration |
Date Submitted: |
01/31/2000 2:41:58 PM |
||||||
|
|
|
|
|
|
|
|
|
|
District Member: |
William Myers |
Service Area: |
Regional |
||||||
|
|
|
|
|
|
|
|
|
|
Counties Affected: |
Okeechobee |
||||||||
|
|
|
|
|
|
|
|
|
|
Recipient: |
South Florida Water Management District |
Contact: |
Frank Berardino |
||||||
|
P. O. Box 24680 |
Contact Phone: |
(561) 546-8836 |
||||||
|
|
West Palm Beach 33416 |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
Project Description: |
|
|
|
|
|
|
|
||
This project involves 4 sub-projects geared to work in concert to improve water quality in Lake Okeechobee. 1) Lake Okeechobee Daries Phosphorus Discharge Remediation - involves the construction and other remediation activities aimed at reducing the runoff of phosphorus from daity and other agricultural operations into tributaries that drain to Lake O. For dairies, these activities will include construction of confinement barns and expanded lagoon facilities remediation of phosphorus hot spots, and BMP's where applicable. For all agricultural operations this will include the development and implementationof comprehensive nutrient management plans and other state/federal cost-shared BMP's that reduce surface flows and improve water quality from pastures and other residual sources. 2) Restoration of Isolated Wetlands - a voluntary landowner based program to modify water management systems on approx. 20 ag. parcels containing drained wetlands. These wetlands will be either reflooded or recreated to retain/detain water in the watershed, thereby slowing runoff and attenuating peak flows. 3) Lake O. Water Retention/Phosphorus Removal - involves a buy-out of the US Army Corps of Engineers' cost-share (50-50) of the Lake O. Critical Project, which would shift responsibility of design and construction from the USACE to SFWMD, but in return would provide greater certainty and control over the project schedule (thereby expediting the process; and 4) Retrofit Water Control Structures - retrofitting project culverts flowing into Lake. O. These devises would result in a reduction in sediment loads from reaching the lake and improve water quality in the process. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Services Provided/Benefit to State: |
|
|
|
|
|
||||
Lake O. is listed under section 303 (d) of the Clean Water act as a Florida Impaired water body. The lake is impaired due to the excessive concentrations of phosphorus, which have caused accelerated eutrophication, algal blooms, and other biological changes. Concentrations of total phosphorus in the late water are more than two-fold higher than the SWIM goal of 40 ppb, and phosphorus loading has currently exceeded the target of 40% load reduction specified in the 1987 SWIM Act. Phosphorus discharge limits of 180ppb, established for the four priority basins in Chapter 40B-61 FAC, also have consistantly been exceeded. Numerous dairy sites in those basins discharge water with total phosphorus concentrations in excess of 2,000ppb. These recurring water qualityissues are documented inthe 1997 Lake Okeechobee SWIM Plan and in the 1999 Lake Okeechobee Action Plan. The projects that comprise this grant proposal are aimed at reducing triutary phosphorus concentrations and phosphorus loads to the lake. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Measurable Outcome Anticipated: |
|
|
|
|
|
||||
The goal of these projects is to reduce the phosphorus concentrations of the runoff from each of the sites to, or below, the target required by the Works of the District Regulatory Program. |
|||||||||
|
|
|
|
|
|
|
|
|
|
Amount requested from the State for this project this year: |
$38,500,000 |
||||||||
|
|
|
|
|
|
|
|
|
|
Total cost of the project: |
$77,000,000 |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Request has been made to fund: |
Construction |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
Is there Local Government or Private match for this request? |
|
Unknown |
|
||||||
|
|
|
|
|
|
|
|
|
|
Was this project previously funded by the State? |
|
Unknown |
|
||||||
|
|
|
|
|
|
|
|
|
|
Is future-year funding likely to be requested? |
|
Yes |
|
||||||
|
Amount: |
$10,000,000 |
|
|
|
|
|
||
|
Purpose for future year funding: |
|
Yesmonitoring |
|
|||||
|
Will this be an annual request? |
|
|
Unknown |
|
|
|||
|
|
|
|
|
|
|
|
|
|
Was this project included in an Agency's Budget Request? |
|
Yes |
|
||||||
|
Agency: |
Environmental Protection, Department Of |
|||||||
Was this project included in the Governor's Recommended Budget? |
Yes |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Is there a documented need for this project? |
|
Yes |
|
||||||
|
Documentation: |
Lake Okeechobee SWIM Plan |
|||||||
|
|
|
|
|
|
|
|
|
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
Unknown |
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|