403.0872 Operation permits for major sources of
air pollution; annual operation license fee. ---Provided that
program approval pursuant to 42 U.S.C. s. 7661a has been received from the
United States Environmental Protection Agency, beginning January 2, 1995, each
major source of air pollution, including electrical power plants certified
under s. 403.511, must obtain from the department an operation permit for a
major source of air pollution under this section, which is the only department
operation permit for a major source of air pollution required for such source.
Operation permits for major sources of air pollution, except general permits
issued pursuant to s. 403.814, must be issued in accordance with the following
procedures and in accordance with chapter 120; however, to the extent that
chapter 120 is inconsistent with the provisions of this section, the
procedures contained in this section prevail:
(1) For purposes of this section, a major source of air pollution
means a stationary source of air pollution, or any group of stationary sources
within a contiguous area and under common control, which emits any regulated
air pollutant and which is any of the following:
(a) A major source within the meaning of 42 U.S.C. s.
7412(a)(1);
(b) A major stationary source or major emitting facility within the
meaning of 42 U.S.C. s. 7602(j) or 42 U.S.C. subchapter I, part C or part
D;
(c) An affected source within the meaning of 42 U.S.C. s.
7651a(1);
(d) An air pollution source subject to standards or regulations under
42 U.S.C. s. 7411 or s. 7412; provided that a source is not a major source
solely because of its regulation under 42 U.S.C. s. 7412(r); or
(e) A stationary air pollution source belonging to a category
designated as a 40 C.F.R. part 70 source by regulations adopted by the
administrator of the United States Environmental Protection Agency under 42
U.S.C. ss. 7661 et seq. The department shall exempt those facilities that are
subject to this section solely because they are subject to requirements under
42 U.S.C. s. 7411 or solely because they are subject to reporting requirements
under 42 U.S.C. s. 7412 for as long as the exemption is available under
federal law.
(2) An application for an operation permit for a major source of
air pollution must be submitted in accordance with rules of the department
governing permit applications. The department shall adopt rules defining the
timing, content, and distribution of an application for a permit under this
section. A permit application processing fee is not required. The department
may issue an operation permit for a major source of air pollution only when it
has reasonable assurance that the source applies pollution control technology,
including fuel or raw material selection, necessary to enable it to comply
with the standards or rules adopted by the department or an approved
compliance plan for that source. If two or more major air pollution sources
that belong to the same Major Group as described in the Standard Industrial
Classification Manual, 1987, are operated at a single site, the owner may
elect to receive a single operation permit covering all such sources at the
site.
(a) An application for a permit under this section is timely and
complete if it is submitted in accordance with department rules governing the
timing of applications and substantially addresses the information specified
in completeness criteria determined by department rule in accordance with
applicable regulations of the United States Environmental Protection Agency
governing the contents of applications for permits under 42 U.S.C. s.
7661b(d). Unless the department requests additional information or otherwise
notifies the applicant of incompleteness within 60 days after receipt of an
application, the application is complete.
(b) Any permitted air pollution source that submits a timely and
complete application for a permit under this section is entitled to operate in
compliance with its existing air permit pending the conclusion of proceedings
associated with its application. Notwithstanding the timing requirements of
paragraph (c) and subsection (3), the department may process applications
received during the first year of permit processing under this section, in a
manner consistent with 42 U.S.C. s. 7661b(c).
(c) The department may request additional information necessary to
process a permit application subsequent to a determination of completeness in
accordance with s. 403.0876(1).
(3) Within 90 days after the date on which the department
receives all information necessary to process an application for a permit
under this section, the department shall issue a draft permit or a
determination that the requested permit should be denied. A draft permit must
contain all conditions that the department finds necessary to ensure that
operation of the source will be in compliance with applicable law, rules, or
compliance plans. If the department proposes to deny the permit application,
the department's determination must provide an explanation for the denial. The
department shall furnish a copy of each draft permit to the United States
Environmental Protection Agency and to any contiguous state whose air quality
could be affected or which is within 50 miles of the source pursuant to
procedures established by department rule.
(4) The department shall require the applicant to publish notice
of any draft permit in accordance with department rule. The department must
accept public comment with respect to a draft permit for 30 days following the
date of notice publication. The notice must be published in a newspaper of
general circulation as defined in s. 403.5115(2). If comments received during
this period result in a change in the draft permit, the department must issue
a revised draft permit, which shall be supplied to the United States
Environmental Protection Agency and to any contiguous state whose air quality
could be affected or which is within 50 miles of the source.
(5) Any person whose substantial interests are affected by a
draft permit or the denial determination may request an administrative hearing
under s. 120.57, in accordance with the rules of the department. A draft
permit must notify the permit applicant of any review process applicable to
the permit decision of the department. The department shall prescribe, by
rule, a suitable standard format for such notification.
(6) If a hearing is not requested under s. 120.57, the draft
permit will become the department's proposed permit but does not become final
until the time for federal review of the proposed permit has elapsed. The
department shall furnish the United States Environmental Protection Agency a
copy of each proposed permit and its written response to any comments
regarding the permit submitted by contiguous states. If no objection to the
proposed permit is made by the United States Environmental Protection Agency
within the time established by 42 U.S.C. s. 7661d, the proposed permit must
become final no later than 55 days after the date on which the proposed permit
was mailed to the United States Environmental Protection Agency. The
department shall issue a conformed copy of the final permit as soon as is
practicable thereafter.
(7) If a draft permit is the subject of an administrative hearing
under s. 120.57, a proposed permit containing changes, if any, resulting from
the hearing process, after the conclusion of the hearing, must be issued and a
copy must be provided to the applicant, to the United States Environmental
Protection Agency, and to any contiguous state whose air quality could be
affected or which is within 50 miles of the source, as soon as practicable.
The proposed permit shall not become final until the time for review, by the
United States Environmental Protection Agency, of the proposed permit has
elapsed. If comments from a contiguous state regarding the permit are
received, the department must provide a written response to the applicant, to
the state, and to the United States Environmental Protection Agency. If no
objection to the proposed permit is made by the United States Environmental
Protection Agency within the time established by 42 U.S.C. s. 7661d, the
proposed permit must become final no later than 55 days after the date on
which the proposed permit was mailed to the United States Environmental
Protection Agency. The department shall issue a conformed copy of the final
permit as soon as is practicable thereafter.
(8) If the administrator of the United States Environmental
Protection Agency timely objects to a proposed permit under this section, the
department must not issue a final permit until the objection is resolved or
withdrawn. A copy of the written objection of the administrator must be
provided to the permit applicant as soon as practicable after the department
receives it. Within 45 days after the date on which the department serves the
applicant with a copy of an objection by the United States Environmental
Protection Agency to a proposed permit, the applicant may file a written reply
to the objection. The written reply must include any supporting materials that
the applicant desires to include in the record relevant to the issues raised
by the objection. The written reply must be considered by the department in
issuing a final permit to resolve the objection of the administrator. A final
permit issued by the department to resolve an objection of the administrator
is not subject to s. 120.57.
(9) A final permit issued under this section is subject to
judicial review under s. 120.68. If judicial review of a final permit results
in material changes to the conditions of the permit, the department shall
notify the United States Environmental Protection Agency and any state that is
contiguous to this state whose air quality could be affected or that is within
50 miles of the source, pursuant to rules of the department.
(10) If the department is notified by the administrator of the
United States Environmental Protection Agency that cause exists to terminate,
modify, or revoke and reissue a permit under this section, the department
shall, within 90 days after receipt of such notification, furnish to the
administrator and the permittee a proposed determination of termination,
modification, or revocation and reissuance as appropriate. Within 45 days
after the date on which the department notifies the permittee that the United
States Environmental Protection Agency proposes action regarding its permit,
the permittee may file a written response concerning the proposed action. The
written response must include any supporting materials that the permittee
desires to include in the record relevant to the issues raised by the proposed
action. The permittee's written response must be considered by the department
in formulating its proposed determination under this subsection.
(11) Commencing in 1993, each major source of air pollution
permitted to operate in this state must pay between January 15 and March 1 of
each year, upon written notice from the department, an annual operation
license fee in an amount determined by department rule. The annual operation
license fee shall be terminated immediately in the event the United States
Environmental Protection Agency imposes annual fees solely to implement and
administer the major source air-operation permit program in Florida under 40
C.F.R. s. 70.10(d).
(a) The annual fee must be assessed based upon the source's previous
year's emissions and must be calculated by multiplying the applicable annual
operation license fee factor times the tons of each regulated air pollutant
(except carbon monoxide) allowed to be emitted per hour by specific condition
of the source's most recent construction or operation permit, times the annual
hours of operation allowed by permit condition; provided, however, that:
1. For 1993 and 1994, the license fee factor is $10. For 1995, the
license fee factor is $25. In succeeding years, the license fee factor is $25
or another amount determined by department rule which ensures that the revenue
provided by each year's operation license fees is sufficient to cover all
reasonable direct and indirect costs of the major stationary source
air-operation permit program established by this section. The license fee
factor may be increased beyond $25 only if the secretary of the department
affirmatively finds that a shortage of revenue for support of the major
stationary source air-operation permit program will occur in the absence of a
fee factor adjustment. The annual license fee factor may never exceed $35. The
department shall retain a nationally recognized accounting firm to conduct a
study to determine the reasonable revenue requirements necessary to support
the development and administration of the major source air-operation permit
program as prescribed in paragraph (b). The results of that determination must
be considered in assessing whether a $25-per-ton fee factor is sufficient to
adequately fund the major source air-operation permit program. The results of
the study must be presented to the Governor, the President of the Senate, the
Speaker of the House of Representatives, and the Public Service Commission,
including the Public Counsel's Office, by no later than October 31,
1994.
2. For any source that operates for fewer hours during the calendar
year than allowed under its permit, the annual fee calculation must be based
upon actual hours of operation rather than allowable hours if the owner or
operator of the source documents the source's actual hours of operation for
the calendar year. For any source that has an emissions limit that is
dependent upon the type of fuel burned, the annual fee calculation must be
based on the emissions limit applicable during actual hours of
operation.
3. For any source whose allowable emission limitation is specified
by permit per units of material input or heat input or product output, the
applicable input or production amount may be used to calculate the allowable
emissions if the owner or operator of the source documents the actual input or
production amount. If the input or production amount is not documented, the
maximum allowable input or production amount specified in the permit must be
used to calculate the allowable emissions.
4. For any new source that does not receive its first operation
permit until after the beginning of a calendar year, the annual fee for the
year must be reduced pro rata to reflect the period during which the source
was not allowed to operate.
5. For any source that emits less of any regulated air pollutant
than allowed by permit condition, the annual fee calculation for such
pollutant must be based upon actual emissions rather than allowable emissions
if the owner or operator documents the source's actual emissions by means of
data from a department-approved certified continuous emissions monitor or from
an emissions monitoring method which has been approved by the United States
Environmental Protection Agency under the regulations implementing 42 U.S.C.
ss. 7651 et seq., or from a method approved by the department for purposes of
this section.
6. The amount of each regulated air pollutant in excess of 4,000
tons per year allowed to be emitted by any source, or group of sources
belonging to the same Major Group as described in the Standard Industrial
Classification Manual, 1987, may not be included in the calculation of the
fee. Any source, or group of sources, which does not emit any regulated air
pollutant in excess of 4,000 tons per year, is allowed a one-time credit not
to exceed 25 percent of the first annual licensing fee for the prorated
portion of existing air-operation permit application fees remaining upon
commencement of the annual licensing fees.
7. If the department has not received the fee by February 15 of the
calendar year, the permittee must be sent a written warning of the
consequences for failing to pay the fee by March 1. If the department has not
received the fee by March 1 of the calendar year, the department shall impose,
in addition to the fee, a penalty of 50 percent of the amount of the fee, plus
interest on such amount computed in accordance with s. 220.807. The
department may not impose such penalty or interest on any amount underpaid,
provided that the permittee has timely remitted payment of at least 90 percent
of the amount determined to be due and remits full payment within 60 days
after receipt of notice of the amount underpaid. The department may waive the
collection of underpayment and shall not be required to refund overpayment of
the fee, if the amount due is less than 1 percent of the fee, up to $50. The
department may revoke any major air pollution source operation permit if it
finds that the permitholder has failed to timely pay any required annual
operation license fee, penalty, or interest.
8. During the years 1993 through 1999, inclusive, no fee shall be
required to be paid under this section with respect to emissions from any unit
which is an affected unit under 42 U.S.C. s. 7651c.
9. Notwithstanding the computational provisions of this subsection,
the annual operation license fee for any source subject to this section shall
not be less than $250, except that the annual operation license fee for
sources permitted solely through general permits issued under s. 403.814 shall
not exceed $50 per year.
10. Notwithstanding the provisions of s. 403.087(5)(a)4.a.,
authorizing air pollution construction permit fees, the department may not
require such fees for changes or additions to a major source of air pollution
permitted pursuant to this section, unless the activity triggers permitting
requirements under Title I, Part C or Part D, of the federal Clean Air Act, 42
U.S.C. ss. 7470-7514a. Costs to issue and administer such permits shall be
considered direct and indirect costs of the major stationary source
air-operation permit program under s. 403.0873. The department shall, however,
require fees pursuant to the provisions of s. 403.087(5)(a)4.a. for the
construction of a new major source of air pollution that will be subject to
the permitting requirements of this section once constructed and for
activities triggering permitting requirements under Title I, Part C or Part D,
of the federal Clean Air Act, 42 U.S.C. ss. 7470-7514a.
(b) Annual operation license fees collected by the department must be
sufficient to cover all reasonable direct and indirect costs required to
develop and administer the major stationary source air-operation permit
program, which shall consist of the following elements to the extent that they
are reasonably related to the regulation of major stationary air pollution
sources, in accordance with United States Environmental Protection Agency
regulations and guidelines:
1. Reviewing and acting upon any application for such a
permit.
2. Implementing and enforcing the terms and conditions of any such
permit, excluding court costs or other costs associated with any enforcement
action.
3. Emissions and ambient monitoring.
4. Preparing generally applicable regulations or guidance.
5. Modeling, analyses, and demonstrations.
6. Preparing inventories and tracking emissions.
7. Implementing the Small Business Stationary Source Technical and
Environmental Compliance Assistance Program.
8. The study conducted under subparagraph (a)1. and any audits
conducted under paragraph (c).
(c) An audit of the major stationary source air-operation permit
program must be conducted 2 years after the United States Environmental
Protection Agency has given full approval of the program, or by the end of
1996, whichever comes later, to ascertain whether the annual operation license
fees collected by the department are used solely to support any reasonable
direct and indirect costs as listed in paragraph (b). A program audit must be
performed biennially after the first audit.
(12) Permits issued under this section must allow changes within
a permitted facility without requiring a permit revision, if the changes are
not physical changes in, or changes in the method of operation of, the
facility which increase the amount of any air pollutant emitted by the
facility or which result in the emission of any air pollutant not previously
emitted by the facility, and the changes do not exceed the emissions allowable
under the permit (whether expressed therein as a rate of emissions or in terms
of total emissions), provided that the facility provides the administrator and
the department with 30 days' written, advance notice of the proposed changes.
The department shall adopt rules implementing this flexibility
requirement.
(13)
(a) In order to ensure statewide consistency in the implementation of
the national Acid Deposition Control Allowance Transfer System, a department
district office or local pollution control program may not issue or administer
permits under this section for any electrical power plant or any source that
participates in the allowance transfer system.
(b) For emission units that are subject to continuous monitoring
requirements under 42 U.S.C. ss. 7661-7661f or 40 C.F.R. part 75, compliance
with nitrogen oxides emission limits shall be demonstrated based on a 30-day
rolling average, except as specifically provided by 40 C.F.R. part 60 or part
76.
(14) In order to ensure statewide consistency in the permitting
of major sources, a local pollution control program may not issue permits
under this section for sources that belong to Major Group 26, Paper and Allied
Products; for sources that belong to Major Group 28, Chemicals and Allied
Products; or for sources that belong to Industry Number 2061, Cane Sugar,
Except Refining, as defined in the Standard Industrial Classification Manual,
1987. This subsection expires July 1, 1997.
(15) Any permittee that operates in compliance with an
air-operation permit issued under this section is deemed to be in compliance
with applicable permit requirements of the Clean Air Act and all implementing
state, local, and federal air pollution control rules and regulations and all
provisions of this chapter, relating to air pollution, and rules adopted
thereunder.
(16) The department shall adopt a rule to provide for a procedure
for notice to the appropriate approved local pollution control programs,
pursuant to s. 403.182, of any draft permits, amended draft permits, or final
permits issued by the department.
(17) The administrator of the United States Environmental
Protection Agency may intervene as a matter of right in any administrative or
judicial proceeding relating to an operation permit for a major source of air
pollution required under this section.
(18) The department shall require certification of all
applications, submittals, and reports by a responsible official of a major
source of air pollution and shall require the inclusion of those specific
federal requirements listed at 42 U.S.C. s. 7661a(f)(1), (2), and (3) in all
permits to which such terms apply.
History: s. 3, ch. 92-132; s. 3, ch. 93-94; s. 2, ch. 94-321; s. 1, ch. 95-223;
s. 3, ch. 95-292.